{"id":53620,"date":"2026-09-29T10:43:45","date_gmt":"2026-09-29T08:43:45","guid":{"rendered":"https:\/\/www.esclapes.com\/?p=53620"},"modified":"2026-09-29T10:45:30","modified_gmt":"2026-09-29T08:45:30","slug":"refurbishment-various-areas-fomento-altozano-school-alicante","status":"publish","type":"post","link":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/","title":{"rendered":"Refurbishment of various areas at the Fomento Altozano school in Alicante"},"content":{"rendered":"<p><span>The <strong>Colegio de Fomento Altozano<\/strong> commissioned us to carry out a series of works to <strong>upgrade its facilities, with a view to adapting and modernising various areas within the school<\/strong>.<\/span><\/p>\n<p><span>The main reason for this work lies in the strategic change to the school&#8217;s educational model, which is shifting from single-sex education to co-education. This new situation necessitated the refurbishment, reorganisation and comprehensive modernisation of the toilet and changing room facilities, ensuring accessible, equitable and functional spaces for all the new pupils.<\/span><\/p>\n<p><span>In addition to the works described above, the <strong>refurbishment of the music room<\/strong> has also been carried out, involving the installation of a movable partition and the replacement of a brick partition with a glass screen to improve the room&#8217;s natural light, as well as the <strong>construction of a new toilet in the staff room<\/strong>. <\/span><\/p>\n<p><span>Below is a brief description of each of the works carried out:<\/span><\/p>\n<p>&nbsp;<\/p>\n<h2>Refurbishment of toilets and changing rooms:<\/h2>\n<p>New changing rooms at Altozano School in Alicante<\/p>\n<div id=\"metaslider-id-53407\" style=\"width: 100%;\" class=\"ml-slider-3-113-1 metaslider metaslider-flex metaslider-53407 ml-slider has-dots-nav ms-theme-default-base\" role=\"region\" aria-label=\"Nueva presentaci\u00f3n de diapositivas\" data-height=\"825\" data-width=\"1100\">\n    <div id=\"metaslider_container_53407\">\n        <div id=\"metaslider_53407\">\n            <ul aria-live='off' class='slides'>\n                <li style=\"display: block; width: 100%;\" class=\"slide-53418 ms-image \" aria-roledescription=\"slide\" data-date=\"2026-08-24 10:01:56\" data-filename=\"Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-4-1100x825.jpg\" data-slide-type=\"image\"><img decoding=\"async\" src=\"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-4-1100x825.jpg\" height=\"825\" width=\"1100\" alt=\"Vestuarios nuevos en el Colegio Altozano de Alicante\" class=\"slider-53407 slide-53418 msDefaultImage\" title=\"Vestuarios nuevos en el Colegio Altozano de Alicante 4\" \/><\/li>\n                <li style=\"display: none; width: 100%;\" class=\"slide-53416 ms-image \" aria-roledescription=\"slide\" data-date=\"2026-08-24 10:01:56\" data-filename=\"Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2-1100x825.jpg\" data-slide-type=\"image\"><img decoding=\"async\" src=\"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2-1100x825.jpg\" height=\"825\" width=\"1100\" alt=\"Vestuarios nuevos en el Colegio Altozano de Alicante\" class=\"slider-53407 slide-53416 msDefaultImage\" title=\"Vestuarios nuevos en el Colegio Altozano de Alicante 2\" \/><\/li>\n                <li style=\"display: none; width: 100%;\" class=\"slide-53415 ms-image \" aria-roledescription=\"slide\" data-date=\"2026-08-24 10:01:55\" data-filename=\"Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-1-1100x825.jpg\" data-slide-type=\"image\"><img decoding=\"async\" src=\"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-1-1100x825.jpg\" height=\"825\" width=\"1100\" alt=\"Vestuarios nuevos en el Colegio Altozano de Alicante\" class=\"slider-53407 slide-53415 msDefaultImage\" title=\"Vestuarios nuevos en el Colegio Altozano de Alicante 1\" \/><\/li>\n                <li style=\"display: none; width: 100%;\" class=\"slide-53417 ms-image \" aria-roledescription=\"slide\" data-date=\"2026-08-24 10:01:56\" data-filename=\"Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-3-1100x825.jpg\" data-slide-type=\"image\"><img decoding=\"async\" src=\"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-3-1100x825.jpg\" height=\"825\" width=\"1100\" alt=\"Vestuarios nuevos en el Colegio Altozano de Alicante\" class=\"slider-53407 slide-53417 msDefaultImage\" title=\"Vestuarios nuevos en el Colegio Altozano de Alicante 3\" \/><\/li>\n            <\/ul>\n        <\/div>\n        \n    <\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p><span>The work undertaken has mainly consisted of the following:<\/span><\/p>\n<ul>\n<li>\n<h3><span>Demolition and dismantling phase:<\/span><\/h3>\n<ul>\n<li><span>Demolition of ceramic flooring and skirting boards.<\/span><\/li>\n<li><span>Chipping away plaster from vertical surfaces (walls).<\/span><\/li>\n<li><span>Dismantling of electrical installations.<\/span><\/li>\n<li><span>Removal of lighting installations.<\/span><\/li>\n<li><span>Dismantling of plumbing and drainage systems.<\/span><\/li>\n<li><span>Removal of washbasins, toilets and other sanitary fittings.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<ul>\n<li>\n<h3><span>Renovation of internal infrastructure and pipework:<\/span><\/h3>\n<ul>\n<li><span>Upgrading the plumbing system with the installation of new water supply points.<\/span><\/li>\n<li><span>Refurbishment of the drainage system with new sewerage pipes installed.<\/span><\/li>\n<li><span>Upgrading of the electrical and lighting installations in accordance with the new proposed interior layout.<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<ul>\n<li>\n<h3><span>Finishes, fittings and adaptation for mixed-use:<\/span><\/h3>\n<ul>\n<li><span>Installation of new partition walls to divide the modules independently and securely.<\/span><\/li>\n<li><span>Wall cladding and suspended ceilings.<\/span><\/li>\n<li><span>Waterproofing of the new shower cubicles.<\/span><\/li>\n<li><span>Installation of new porcelain stoneware flooring.<\/span><\/li>\n<li><span>Tiling with blue porcelain stoneware tiles.<\/span><\/li>\n<li><span>Fitting of new wooden doors for access to the bathrooms.<\/span><\/li>\n<li><span>Installation of toilet cubicles made from phenolic board.<\/span><\/li>\n<li><span>Fitting of aluminium doors in changing rooms.<\/span><\/li>\n<li><span>Installation of new washbasins, toilets, showers and taps in accordance with the new layout.<\/span><\/li>\n<li><span>Painting work on the walls of toilets and changing rooms.<\/span><\/li>\n<li><span>Installation of mirrors, new soap dispensers, toilet roll holders, hand dryers, toilet brush holders, waste bins, etc\u2026<\/span><\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<h2><span>Photos of the initial condition:<\/span><\/h2>\n<p>&nbsp;<\/p>\n<h2><span>Photos of the work carried out and the finished result:<\/span><\/h2>\n<p>&nbsp;<\/p>\n<h2>Installation of a movable partition and glass screen in the music room<\/h2>\n<p>Another of the works carried out was the installation of a one-way movable partition with sliding panels, using an aluminium top-track sliding system, in the music room. This involved the demolition of the brick partition wall where the entrance to the room was located, to allow for the subsequent installation of a glass partition.<br \/>\nBelow are some photographs of the entire construction process:<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Colegio de Fomento Altozano commissioned us to carry out a series of works to upgrade its facilities, with a view to adapting and modernising various areas within the school. The main reason for this work lies in the strategic change to the school&#8217;s educational&#8230;<\/p>\n","protected":false},"author":3,"featured_media":53619,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[483,357,402],"tags":[],"class_list":["post-53620","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-alicante-en","category-blog","category-schools"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v24.9 (Yoast SEO v28.6) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Refurbishment of various areas at the Fomento Altozano school in Alicante - Esclap\u00e9s e Hijos, S.L.<\/title>\n<meta name=\"description\" content=\"Esclap\u00e9s e Hijos begins construction of the new changing rooms at the Altozano bilingual state-subsidised school in Alicante.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Refurbishment of various areas at the Fomento Altozano school in Alicante\" \/>\n<meta property=\"og:description\" content=\"Esclap\u00e9s e Hijos begins construction of the new changing rooms at the Altozano bilingual state-subsidised school in Alicante.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/\" \/>\n<meta property=\"og:site_name\" content=\"Esclap\u00e9s e Hijos, S.L.\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-29T08:43:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-09-29T08:45:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1599\" \/>\n\t<meta property=\"og:image:height\" content=\"899\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"H\u00e9ctor Pe\u00f1a\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"H\u00e9ctor Pe\u00f1a\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/\"},\"author\":{\"name\":\"H\u00e9ctor Pe\u00f1a\",\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/#\\\/schema\\\/person\\\/2f6dd550c3e9652d096b6af87a6e5454\"},\"headline\":\"Refurbishment of various areas at the Fomento Altozano school in Alicante\",\"datePublished\":\"2026-09-29T08:43:45+00:00\",\"dateModified\":\"2026-09-29T08:45:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/\"},\"wordCount\":473,\"publisher\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.esclapes.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg\",\"articleSection\":[\"Alicante\",\"Blog\",\"Schools\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/\",\"url\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/\",\"name\":\"Refurbishment of various areas at the Fomento Altozano school in Alicante - Esclap\u00e9s e Hijos, S.L.\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.esclapes.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg\",\"datePublished\":\"2026-09-29T08:43:45+00:00\",\"dateModified\":\"2026-09-29T08:45:30+00:00\",\"description\":\"Esclap\u00e9s e Hijos begins construction of the new changing rooms at the Altozano bilingual state-subsidised school in Alicante.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.esclapes.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg\",\"contentUrl\":\"https:\\\/\\\/www.esclapes.com\\\/wp-content\\\/uploads\\\/2026\\\/08\\\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg\",\"width\":1599,\"height\":899,\"caption\":\"Vestuarios nuevos en el Colegio Altozano de Alicante\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Portada\",\"item\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Refurbishment of various areas at the Fomento Altozano school in Alicante\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/\",\"name\":\"Esclap\u00e9s e Hijos, S.L.\",\"description\":\"Construcci\u00f3n de naves industriales y rehabilitaci\u00f3n de edificios, pilares, estructura, fachadas en todo tipo edificios. Ofrecemos buen precio y mejor calidad.\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"Place\"],\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/#organization\",\"name\":\"Esclap\u00e9s e Hijos, S.L.\",\"alternateName\":\"Esclap\u00e9s e Hijos\",\"url\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/\",\"logo\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#local-main-organization-logo\"},\"image\":{\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#local-main-organization-logo\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/11000369\\\/admin\\\/feed\\\/posts\\\/\",\"https:\\\/\\\/es.linkedin.com\\\/company\\\/esclaps-e-hijos-sl\"],\"openingHoursSpecification\":[{\"@type\":\"OpeningHoursSpecification\",\"dayOfWeek\":[\"Monday\",\"Tuesday\",\"Wednesday\",\"Thursday\",\"Friday\",\"Saturday\",\"Sunday\"],\"opens\":\"09:00\",\"closes\":\"17:00\"}]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/#\\\/schema\\\/person\\\/2f6dd550c3e9652d096b6af87a6e5454\",\"name\":\"H\u00e9ctor Pe\u00f1a\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/94a49d6129b32d9eb6d5056109668fdaa28eabf12d6898d7916ce9dc2c9b5898?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/94a49d6129b32d9eb6d5056109668fdaa28eabf12d6898d7916ce9dc2c9b5898?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/94a49d6129b32d9eb6d5056109668fdaa28eabf12d6898d7916ce9dc2c9b5898?s=96&d=mm&r=g\",\"caption\":\"H\u00e9ctor Pe\u00f1a\"},\"url\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/author\\\/hector\\\/\"},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.esclapes.com\\\/en\\\/refurbishment-various-areas-fomento-altozano-school-alicante\\\/#local-main-organization-logo\",\"url\":\"https:\\\/\\\/www.esclapes.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/ESCLAPES-LOGO-CUADRADO.png\",\"contentUrl\":\"https:\\\/\\\/www.esclapes.com\\\/wp-content\\\/uploads\\\/2023\\\/07\\\/ESCLAPES-LOGO-CUADRADO.png\",\"width\":1191,\"height\":1191,\"caption\":\"Esclap\u00e9s e Hijos, S.L.\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Refurbishment of various areas at the Fomento Altozano school in Alicante - Esclap\u00e9s e Hijos, S.L.","description":"Esclap\u00e9s e Hijos begins construction of the new changing rooms at the Altozano bilingual state-subsidised school in Alicante.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/","og_locale":"en_US","og_type":"article","og_title":"Refurbishment of various areas at the Fomento Altozano school in Alicante","og_description":"Esclap\u00e9s e Hijos begins construction of the new changing rooms at the Altozano bilingual state-subsidised school in Alicante.","og_url":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/","og_site_name":"Esclap\u00e9s e Hijos, S.L.","article_published_time":"2026-09-29T08:43:45+00:00","article_modified_time":"2026-09-29T08:45:30+00:00","og_image":[{"width":1599,"height":899,"url":"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg","type":"image\/jpeg"}],"author":"H\u00e9ctor Pe\u00f1a","twitter_card":"summary_large_image","twitter_misc":{"Written by":"H\u00e9ctor Pe\u00f1a","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#article","isPartOf":{"@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/"},"author":{"name":"H\u00e9ctor Pe\u00f1a","@id":"https:\/\/www.esclapes.com\/en\/#\/schema\/person\/2f6dd550c3e9652d096b6af87a6e5454"},"headline":"Refurbishment of various areas at the Fomento Altozano school in Alicante","datePublished":"2026-09-29T08:43:45+00:00","dateModified":"2026-09-29T08:45:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/"},"wordCount":473,"publisher":{"@id":"https:\/\/www.esclapes.com\/en\/#organization"},"image":{"@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#primaryimage"},"thumbnailUrl":"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg","articleSection":["Alicante","Blog","Schools"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/","url":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/","name":"Refurbishment of various areas at the Fomento Altozano school in Alicante - Esclap\u00e9s e Hijos, S.L.","isPartOf":{"@id":"https:\/\/www.esclapes.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#primaryimage"},"image":{"@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#primaryimage"},"thumbnailUrl":"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg","datePublished":"2026-09-29T08:43:45+00:00","dateModified":"2026-09-29T08:45:30+00:00","description":"Esclap\u00e9s e Hijos begins construction of the new changing rooms at the Altozano bilingual state-subsidised school in Alicante.","breadcrumb":{"@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#primaryimage","url":"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg","contentUrl":"https:\/\/www.esclapes.com\/wp-content\/uploads\/2026\/08\/Vestuarios-nuevos-en-el-Colegio-Altozano-de-Alicante-2.jpg","width":1599,"height":899,"caption":"Vestuarios nuevos en el Colegio Altozano de Alicante"},{"@type":"BreadcrumbList","@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Portada","item":"https:\/\/www.esclapes.com\/en\/"},{"@type":"ListItem","position":2,"name":"Refurbishment of various areas at the Fomento Altozano school in Alicante"}]},{"@type":"WebSite","@id":"https:\/\/www.esclapes.com\/en\/#website","url":"https:\/\/www.esclapes.com\/en\/","name":"Esclap\u00e9s e Hijos, S.L.","description":"Construcci\u00f3n de naves industriales y rehabilitaci\u00f3n de edificios, pilares, estructura, fachadas en todo tipo edificios. Ofrecemos buen precio y mejor calidad.","publisher":{"@id":"https:\/\/www.esclapes.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.esclapes.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","Place"],"@id":"https:\/\/www.esclapes.com\/en\/#organization","name":"Esclap\u00e9s e Hijos, S.L.","alternateName":"Esclap\u00e9s e Hijos","url":"https:\/\/www.esclapes.com\/en\/","logo":{"@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#local-main-organization-logo"},"image":{"@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#local-main-organization-logo"},"sameAs":["https:\/\/www.linkedin.com\/company\/11000369\/admin\/feed\/posts\/","https:\/\/es.linkedin.com\/company\/esclaps-e-hijos-sl"],"openingHoursSpecification":[{"@type":"OpeningHoursSpecification","dayOfWeek":["Monday","Tuesday","Wednesday","Thursday","Friday","Saturday","Sunday"],"opens":"09:00","closes":"17:00"}]},{"@type":"Person","@id":"https:\/\/www.esclapes.com\/en\/#\/schema\/person\/2f6dd550c3e9652d096b6af87a6e5454","name":"H\u00e9ctor Pe\u00f1a","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/94a49d6129b32d9eb6d5056109668fdaa28eabf12d6898d7916ce9dc2c9b5898?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/94a49d6129b32d9eb6d5056109668fdaa28eabf12d6898d7916ce9dc2c9b5898?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/94a49d6129b32d9eb6d5056109668fdaa28eabf12d6898d7916ce9dc2c9b5898?s=96&d=mm&r=g","caption":"H\u00e9ctor Pe\u00f1a"},"url":"https:\/\/www.esclapes.com\/en\/author\/hector\/"},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.esclapes.com\/en\/refurbishment-various-areas-fomento-altozano-school-alicante\/#local-main-organization-logo","url":"https:\/\/www.esclapes.com\/wp-content\/uploads\/2023\/07\/ESCLAPES-LOGO-CUADRADO.png","contentUrl":"https:\/\/www.esclapes.com\/wp-content\/uploads\/2023\/07\/ESCLAPES-LOGO-CUADRADO.png","width":1191,"height":1191,"caption":"Esclap\u00e9s e Hijos, S.L."}]}},"_links":{"self":[{"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/posts\/53620","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/comments?post=53620"}],"version-history":[{"count":0,"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/posts\/53620\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/media\/53619"}],"wp:attachment":[{"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/media?parent=53620"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/categories?post=53620"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.esclapes.com\/en\/wp-json\/wp\/v2\/tags?post=53620"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}